In this guide
I built a 32×24 three-car garage with almost no construction experience, which means I learned most things the hard way. Here are the mistakes that cost me the most time, money or sweat — and what I’d do instead.
1. Not planning in block modules
I dug my trench for a perfect 32×24, but block foundations don’t come out to round numbers. I had to adjust later. Instead: plan the foundation in whole and half blocks so the outside edge lands at or just under your framing size. More here.
2. Using block for the footer
Leveling a block footer on the bottom of a trench was brutal, and drilling 144 blocks for rebar took ages. Instead: pour a concrete footer with rebar on chairs and build block on top. My footer story.
3. Buying the cheap drill first
A bargain hammer drill couldn’t handle hundreds of holes in block. Instead: buy or rent a real SDS rotary hammer on day one.
4. Running the drill too fast
I turned a couple of blocks to dust before I learned to drill at the slowest speed. Instead: go slow — let the tool work.
5. Not planning how to get the rebar in
At the end of each footer row, there was no room to slide the rebar in. Instead: plan the last few blocks and any extra digging before you set them.
6. Planning to fill the cores by hand
I was about to buy hundreds of bags of concrete. The inspector pointed out that would take weeks and create weak cold joints. Instead: order ready-mix — a conveyor or pump truck if access is tight. How the pour went.
7. Too few helpers on pour day
Concrete comes off the truck fast. Two of us plus a generous driver barely kept up. Instead: line up at least three or four people.
8. Ordering dirt from a big hauler
One truckload from a large company cost a fortune and barely made a dent. Instead: find a local operator with a dump truck. The dirt saga.
9. Taping the permit where the sun could reach it
The “sun-proof” permit pouch faded within a week. Instead: keep the permit card in a cheap mailbox on a post. Permit tips.
10. Not asking the inspector sooner
My inspector was the most helpful person on the whole project. Instead: call early with questions — before you pour, before you cover anything.
11. Leaving rebar uncapped
Vertical rebar at eye level is dangerous. I was lucky. Instead: buy rebar safety caps.
12. Underestimating the time
I started researching in 2006 and finished in 2009. Instead: plan realistically, protect each phase from the weather before you pause, and consider hiring the one-day jobs like roofing.
Key Takeaways
- Most of my mistakes came from not planning a step before starting it.
- Ask the inspector early — it’s free expertise.
- Pay for the jobs a crew does in a day.